Question
A is twice as good a workman as B and together they
finish a piece of work in 14 days. The number of days taken by A alone to finish the work isSolution
Let daily work done of A =2units & Daily work done of B =1units So (A+B)’s 1 day work = 2+1 = 3units; Total work done by A & B in 14 days = 14×3 =42 units So A alone can complete job in = 42/2 = 21 days
Two ladies simultaneously leave cities A and B connected by a straight road and travel towards each other. The first lady travels 3 km/hr faster...
A vehicle was scheduled to complete a 360 km journey in 6 hours. For the initial 4 hours, it maintained a steady speed of 56 km/h. At what minimum speed...
- A truck was moving at 50 km/hr and after ‘x’ hours it increased its speed by 15 km/hr. Then, it continued at the new speed for (x + 4) hours. If the di...
Buses A and B are moving around a circular ground of radius 420 m. If the speeds of the buses A and B are 12 m/sec and 15 m/sec respectively, then what ...
A,B and C run around a Circular track starting from the same point simultaneously and in the same direction at the speed of 8 kmph, 12 kmph and 16 kmph ...
A car traveling at a speed of 60 km/h covers a certain distance in 6 hours. If the car increases its speed by 20%, how much time will it save for the sa...
- A sphere has a diameter of 35 cm. Find its total surface area.
A train passes two people who are walking in the opposite direction of the train at the rates of 4 m/s and 10 m/sec in 12 seconds and 10 seconds respect...
A car's speed is 20% faster than that of a bike. The car takes 30 minutes longer than the bike to cover 120 km, while the bike covers 80 km. Find the ti...
On Diwali, a child Plants a bomb at a place and starts running at 60 m/s. After 58 seconds the bomb blasted. In how much time the sound of blast will be...