‘A’ can do a piece of work in 20 days. ‘B’ can do 80% of the same work in 30 days. If they work together for the entire time and get paid Rs.1610, then find the share of ‘A’.
Let the total work be 60 units. (LCM of 20 and 30) Efficiency of A = 60/20 = 3 units/day Efficiency of B = (60/30) × (80/100) = 8/5 units/day Ratio of the efficiency of A : B = 3 : 8/5 = 15:8 Share of A = (15/23) × 1610 = Rs.1050
Objective of INM is
On which date is National Small Scale Industry Day celebrated annually in India?
Ti Plasmid is present in
Which one of the following varieties of potato is tolerant to frost?
The condition where the plant is unable to produce a zygote with its own pollen is called as?
Which of the following fruit is highly drought tolerant?
Watershed is a –
What is the term for a soil structure that is characterized by horizontal layers or plates of soil particles?
Which species is considered a detritivorous bottom feeder among the Indian Major Carps?
The Botanical name of which fruit is Vitis vinifera?