Question
A can do a work in 8 days and B in 12 days. If they work
on it together for 2 days then in how many days the remaining work will be completed by B?Solution
Total work = Number of days × 1 day’s work (efficiency) Total work = LCM (8, 12) = 24 unit 1 day’s work of A = 24/8 = 3 unit 1 day’s work of B = 24/12 = 2 unit 1 day’s work of (A + B) = 3 + 2 = 5 unit Now, 2 day’s work of (A + B) together = 2 × 5 = 10 unit Remaining work = 24 – 10 = 14 Remaining work completed by B = 14/2 = 7 days
If the average of two numbers is 13 and the square root of their product is 12, then the difference between the numbers is:
What is the smallest natural number that should be added to 1030 so that the square root of the sum is a natural number?
A horse is tethered to a peg fixed at one corner of a rectangular grass field measuring 45 metres in length and 25 metre...
Determine the value of (0.88)2Â
Find the square root of 0.0324.
Two times a number, added to the square of that number, gives 3. What could be the possible answer for this number?
Find the Square root of √14641
Calculate the lateral surface area of a right circular cone having a radius of 5 cm and a height of 12 cm.
Find the value of ∛ 474552
Solve the following :-