Question
A can do a work in 8 days and B in 12 days. If they work
on it together for 2 days then in how many days the remaining work will be completed by B?Solution
Total work = Number of days × 1 day’s work (efficiency) Total work = LCM (8, 12) = 24 unit 1 day’s work of A = 24/8 = 3 unit 1 day’s work of B = 24/12 = 2 unit 1 day’s work of (A + B) = 3 + 2 = 5 unit Now, 2 day’s work of (A + B) together = 2 × 5 = 10 unit Remaining work = 24 – 10 = 14 Remaining work completed by B = 14/2 = 7 days
Aluminium Phosphide is used to control stored grain pest _____
‘Centering’. The first cut on a young tea plant is at which of the following:Â
Water is drawn upwards from the water table in a continuous network of pores. This upward movement of water occurs only in saturated soils is called
What is the major limitation of privatized extension services?
The land-related reform enacted to protect tenants from eviction and secure their right to cultivate the land is known as:
Triazines and triazinones inhibit ______
The critical limit for NO3-N (mg/litre) in drinking water (as per WHO standard is:
Khaira disease of rice can be controlled by spraying of ____________ .
Bengal famine in 1943 was caused due to which disease?
The scientific name of the Italian honey bee is