Question
Vijay can do a piece of work in 10 days and Sanjay can
do the same work in 15 days. If Vijay works for 4 days and got Rs. 1680, and the remaining work will completed by Sanjay, then how much rupee Sanjay earned?Solution
Assume total work = LCM (10, 15) = 30 If the entire work is 30 units, Vijay can complete 3 unit per day, and Sanjay can complete 2 unit per days In 4 days, Vijay completes 12 units and got Rs.1680 i.e. Rs.140 per unit. Remaining work = (30 – 12)unit = 18 unit ∴ Sanjay earning = Rs.18 × 140 = Rs. 2520 Â
Coverage for bodily injury and property damage incurred through ownership or operation of a vehicle is called?
What is a coverage designed to protect businesses from liabilities that arise from the conducting of business over the Internet, including copyright inf...
The Motor Vehicles Act, 1988 requires what document as proof of insurance?
The Insurance Ombudsman was established to:Â
A policy that covers the loss of profits due to damage to machinery is:
 Which of the following government increase the foreign direct investment (FDI) limit in the insurance sector to 74% from 49%?
Nethanna Ku Bima insurance scheme is related which of the following state?
The free-look period is of how many days ?
2000 factories require a Sum Insured of Rs.10 crores each. Statistically, we know that 2 factories get destroyed by fire each year. However, we do not ...
The period during which the owner of a deferred annuity makes payments to build up assets is called?