Question
Suraj is one third as good as workman as Pankaj and
together they finish a piece of work in 36 days. The number of days taken by Suraj alone to finish the work isSolution
Ratio of efficiency of Pankaj & Suraj = 3:1 & they do a job in 36 days so let total work = (3+1)`xx` 36 = 144 units Hence Suraj alone will finish this job in = 144/1 = 144 days
Solve for x in the equation: 3(x + 2) + 2(2x - 5) = 5x + 9

If x = 19, then the value of x5 - 20x4 + 20x3 - 20x2 + 20x - 1 is
Given a triangle with two sides measuring 12 cm and 16 cm, which of the following cannot be a possible length for the third side?
The mean age of 30 students was calculated as 15 years. However, it was later discovered that one student's age was mistakenly entered as 15 years inste...
In a triangle ABC, a point D lies on AB and points E and F lie on BC such that DF is parallel to AC and DE is parallel to AF. If BE = 4 cm. EF = 6cm. th...
If a = 32, b = c = 31, then find the value of a 3 Β + b 3 Β + c 3 Β β 3abc.
If x3 + y3 = 9 and x + y=3 then the value of x4 + y4 is:
105, 111, 123, 141, ?, 195
Let {x + (1/x)} = 4, then Determine the value of {xΒ² + (1/xΒ²)}