Start learning 50% faster. Sign in now
Get Started with ixamBee
Start learning 50% faster. Sign in nowATQ, √? × 4 - 374 + 127 + 300 = 117 √? × 4 = 117 + 374 - 127 - 300 √? × 4 = 64 √? = 16 ? = 256
What is the gauge type of the Darjeeling Himalayan Railway?
What is the operational speed target for the Golden Quadrilateral trains?
Which railway track in India uses the rack-and-pinion system for steep sections?
How many route kilometres of Indian Railways are electrified as per the data till 2024?
_____, a member of the 1967 batch, made it to the position of Financial Commissioner of the Indian Railways Board.
Initially, British Railways had adopted a gauge of:
Which bridge is the world's highest railway bridge?
As on 31 March 2011, the total route length of the broad gauge of the Indian Railways was:
What is the name of the AI-powered system launched by Indian Railways for inspecting and sorting linens?
For the Darjeeling Himalayan Railway, protective measures are enshrined in the Railway Act of 1989, which replaced the: