10 men can do a work in 25 days. After 12 days of work,
3 more men were engaged to finish the work. The number of days required to complete the remaining work is:Solution
ATQ- 10Ă—25 =(10Ă—12) +(13Ă—a) 250 =120+13a 13a =130 A = 10days.
Which one the following terminology is used for the process of accumulation of soluble salts at the surface or at some point below the surface of the so...
Polyploidy can be induced by the use of
Which one of the following is associated with Aroma is rice ?
What is the reason for “bitch scorch” in turf?
A type of weeds in which roots are attached with the soil of the water body and other foliage is over the water surface is called as ____
 International Institute of Tropical Agriculture is situated atÂ
What is the name of the improved variety of the national flower Lotus with 108 petals, Â launched by CSIR-National Botanical Research Institute?
A fruit that develops without fertilization is known as:
If the dry matter yield of maize grain is 2000kg and moisture % in grain is 15% then what will be the grain yield?Â
The oxidation of xanthine is catalyzed by xanthine dehydrogenase contains _________ element