A can do as much work in 4 days as B can do in 5, and B
can do as much work in 6 days as C in 7. In what time will C do a piece of work which A can do in a week ?Solution
ATQ,
4A = 5B Efficiency ratio of A : B = 5 : 4 6B = 7C Efficiency ratio of B : C = 7 : 6 Efficiencies ratio of A, B and C = 35 : 28 : 24 Let C will complete the work in x days that A complete in 7 days ⇒ 7 × 35 = 24 × x ⇒ x = 245/24 = 10(5/24)
If the Earth stopped rotating, what would happen to the apparent value of gravity (g) at different locations?
What does the slope of a velocity-time graph represent?
The resistance of a wire is directly proportional to:
What does 'IC' stand for in electronics?
When heated from 0° to 10°C volume of a given mass of water will -
A soap bubble expands isothermally and its radius doubles. The work done by surface tension during this expansion is:
A uniform wire is bent into a circle and a battery is connected across a chord that subtends an angle of 60° at the center. What is the ratio of curren...
A 10 μF capacitor is charged to 50 V and then connected across an uncharged 20 μF capacitor. What is the final potential difference across both capac...
The emission of a beta-minus particle from a nucleus results in:
Which law states that the current through a conductor is directly proportional to the voltage across it?