Question
By which year does the Union Cabinet aim to develop 4
gigawatts (GW) of battery storage through the approved viability gap funding (VGF) scheme?Solution
The Union Cabinet has approved a scheme for providing viability gap funding (VGF) for developing battery storage of 4 gigawatts (Gw) by 2030-31. The VGF for the battery energy storage system (BESS) will have an initial outlay of Rs 9,400 crore and this will include a budgetary grant of Rs 3,700 crore.
A waiter income consist of his salary and tips. During one week his tips were 4/5 of his salary. What portion of his income came from tips?
- The average of five consecutive multiples of 3 is 24. What is the smallest of these numbers?
The digits of a two-digit number are in the ratio 5:2 (tens to units). If the sum of digits is 14, find the product of those digits.
- Determine the remainder when
When a number βNβ is divided by 40, the quotient is 70% more than the divisor and the remainder is 90% of the divisor. Find the value of βNβ.
In a certain pond, there are 60 more crabs than fish. Unfortunately, 20% of the crabs have perished. Additionally, the pond has welcomed 80 new fish. As...
A two-digit number has a sum of its digits equal to 10. Additionally, if 36 is subtracted from this number, the resulting number has its digits reversed...
The average marks scored by boys and girls in a class are 48 and 32, respectively. The total marks obtained by the entire class is 1680, with 40 student...
Find the number of zeroes in the end of 160!
When a number is reduced by 25%, the resulting value is 36 more than 60% of the number's initial value. What is the original number?