Start learning 50% faster. Sign in now
- The SAMRIDH (Startup Accelerators of MeitY for Product Innovation, Development, and Growth) scheme was launched in August 2021 under the National Policy on Software Products, 2019. - It aims to provide financial support and accelerate the growth of 300 start-ups over a four-year period with a total outlay of Rs 99 crore. - The program focuses on providing start-ups with resources such as mentorship, funding, and access to markets.
A train crosses a 500-metre-long platform in 30 seconds, and the same train crosses a tunnel 20% longer than the platform in 42 seconds. Find the speed ...
Train M, ‘x’ metres long crosses (x – 32) metres long platform in 20 seconds while train N having the length (x + 32) metres crosses the same plat...
A train started from station P and preceded towards station Q at a speed of 64 km/h. 45 minutes later, another train started from station Q and preceded...
Train A running at a speed of 45 km/hr crosses train B in 30 seconds. Find the speed of train B (in km/hr), if the sum of the length of train A and B is...
A goods train leaves a station at a certain time and at a fixed speed. After 12 hours, an express train leaves the same station and moves in the same di...
A train takes 7 seconds more to cross a 210-metre-long platform than it takes to cross a pole. If a car running at the speed of 38 m/s takes 70 seconds ...
A train 250 metre long takes 25 sec to cross a man running at a speed of 9 km/hr in the direction same to that of train. What is the speed of the train?
A train Lucknow Express leaves station A at 4 am and reaches station B at 7 am. Another train Kanpur Express leaves station B at 6 am and reaches statio...