Question
Which of the following Statements about PM KUSUM is
/ are True? I - The PM - KUSUM was launched by the MNRE in 2019 . II - The major objective is to endow installation of off - grid solar pumps in rural areas and reduce dependence on grid, in grid - connected areas . III - It is managed by the Power Ministry .Solution
Ministry of New and Renewable Energy ( MNRE ) launched the Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabhiyan ( PM KUSUM ) Scheme for farmers in 2019 . ·      The scheme aims to add solar capacity of 30,800 MW by 2022 with total central financial support of Rs . 34,422 Crore including service charges to the implementing agencies . ·      The Scheme consists of three components : § Component A : 10,000 MW of solar capacity through installation of small Solar Power Plants of individual plants of capacity upto 2 MW . § Component B : Installation of 20 lakh standalone Solar Powered Agriculture Pumps . § Component C : Solarisation of 15 Lakh Grid - connected Agriculture Pumps . ·      Till 31 . 03 . 2026
Which of the following decays does not change the atomic number of the nucleus?
A thin conducting rod of length 3 m is aligned vertically (along the z-axis) and is moving in space with a velocity vector v = (i + 4j) m/s within a un...
An electric motor converts _____ energy to mechanical energy.
A particle is projected such that its velocity vector sweeps equal angles with horizontal at equal time intervals. The motion is best described as:
The group velocity of matter waves associated with a moving particle is:
What is the minimum escape velocity of rocket to be launched into space?
Which device is best suited for measuring the temperature inside metallurgical furnaces?
The pitch of a sound is primarily determined by which of the following?
If Planck’s constant h, gravitational constant G, and speed of light v are taken as fundamental units, the dimension of time is:
The point where the total mass of a body is considered to be concentrated is known as what?