Question
 For the development of infrastructure in the state,
which state has signed an MoU with NHML(National Highway Logistics Management Limited?Solution
The state government has signed an MoU with the NHML for the infrastructure development there.
A train crosses a pole in 36 seconds and a platform in 52 seconds. If the speed of the train is 54 km/hr, then what is the length of the platform?
Length of a train, whose speed is 36 km/h, is 180 metres. Find the time taken (in seconds) by train to cross a bridge of length 120 metres.
Train A running at speed of 90 km/hr crosses a platform having twice the length of train in 12 sec. Train B whose length is 340m crosses same platform i...
A train crosses a pole and a platform of length 300 metres in 9 seconds and 24 seconds, respectively. Find the length of train.
Train ‘A’ can cross a pole in 6 seconds and a 120 metre long platform in 12 seconds. If the ratio of length of train ‘A’ and train ‘B’ is 2:...
Ratio of the lengths of two trains ‘X’ and ‘Y’ is 3:4 respectively and the ratio of time taken by them to cross a pole is 1:2 respectively. If s...
A train, which is moving at the rate of 60 miles per hour, is brought to rest in 3 minutes with a uniform retardation, find this retardation, and also t...
Train ‘A’ can cross a pole in 4 seconds and a 150 metre long platform in 10 seconds. If the ratio of length of train ‘A’ and train ‘B’ is 2:...
Train A running at speed of 54 km/hr crosses a platform having twice the length of train in 12 sec. Train B whose length is 240m crosses same platform i...
A train takes 16 seconds to pass a pole and 36 seconds to cross a platform 250 meters long. Calculate the total distance the train would cover if it tra...