Question
Which of the following is considered Non Tax Revenue of
the Govt., of India as projected in the Union Budget?Solution
The correct answer is E
Train A takes 90 seconds to cross a telegraph pole by travelling at 18 kmph speed. Train B has its length 60% more than A. It takes 40 seconds to cross ...
The ratio between the speeds of train J and K is 7:5 respectively. Train J which is (a+140) metre long can cross a pole in 24 seconds. If train K can cr...
A train traveling at 54 km/h takes 25 seconds to pass a pole. Calculate the time it would take for the train to cross a platform, given that the ratio o...
Two trains of equal lengths take 30 seconds and 45 seconds respectively to cross a telegraph post. If the length of each train be 450 metres, in what ti...
The speed of a Vande Bharat train is 72 km/h, and it takes 16 seconds to cross a tree. Determine the time taken by the train to cross a platform when th...
Length of a train, whose speed is 60 km/h, is 360 metres. Find the time taken (in seconds) by train to cross a bridge of length 240 metres.
A train takes 16 seconds to pass a pole and 36 seconds to cross a platform 250 meters long. Calculate the total distance the train would cover if it tra...
Train M, βxβ metres long crosses (x β 35) metres long platform in 25 seconds while train N having the length (x + 35) metres crosses the same plat...
Train A running at a speed of 45 km/hr crosses train B in 30 seconds. Find the speed of train B (in km/hr), if the sum of the length of train A and B is...
Train βAβ running with a speed of 108 km/hr crosses a vertical pole in 12 seconds. Find the approx. time taken by the train βAβ to cross a train...