Start learning 50% faster. Sign in now
The correct answer is C
A and B can complete a piece of work in 12 days and 18 days, respectively. They start working together but A leaves after 6 days. How many more days wil...
4m = Sec A, 4/m = Tan A, find the value of 4( m2 - 1/m2)
How can you freeze both rows and columns in an Excel spreadsheet?
Find the surface area of the smallest cube that can perfectly fit a sphere of volume 288π cm3 inside it.
In a triangle, the inradius is 6 cm, the circumradius is 9 cm, and the area is 54 cm². What is the semiperimeter of the triangle?
If (a + b) = 8 and ab = 10, then find the value of (a2 + b2).
A man travels the first part of his journey at a speed of 40 km/h and the second part at a speed of 60 km/h. What is the average speed of the man?
67.2, 8.4, 1.2, 0.2, 0.04, ?
Which company had the highest total production for the year?