Question
North India’s largest floating Solar power project is
installed in which city?Solution
Northern India's largest floating solar power project is installed at waterworks, Sector 39 in Chandigarh. The project has a capacity of 2000kWp and is worth Rs 11.70 crore, including 10 years of operations and maintenance.The 500kWp floating solar power plant with fountains has been installed at Dhanas Lake at a total cost of Rs 3.34 crore.
‘A’ and ‘B’ started moving towards each other at same time with a speed of 27 km/hr and 9 km/hr, respectively. If the dis...
A train covers a certain distance at a speed of 24 km/h and the next same distance with a speed of 42 km/h and the next same distance with a speed of 72...
Train ‘A’ running with a speed of 54 km/hr. can cross a standing goods train of 4 times its length in 20 seconds. Find the time taken by 240 meters ...
Vikas covered a certain distance by bike. If he covers 40% of the distance at 40 km/h, 50% of the distance at 25 km/h and the remaining 10% distance at ...
- The speed ratio of Renu and Meenu is 4:5, respectively. Renu travels a distance of 300 km from point 'A' to 'B', while Meenu covers the same distance but i...
- In a 200-metre race, runner A can give runner B a 20-metre head start and still finish at the same time. Similarly, runner B can give runner C a 10-metre h...
- Nikita covered a total distance of 400 km — partly by airplane at 200 km/h and partly by bus at 80 km/h. If she took 3.5 hours to reach, how many kilomet...
‘A’ and ‘B’ started moving towards each other at same time with a speed of 22 km/hr and 14 km/hr, respectively. If the distance covered by ‘A�...
Ajay and Vishal left the place ‘X’ with different speeds which are in the ratio 9:5 respectively. Ajay left the place 36 seconds after Vishal. If af...
A boy goes to school at 9 km/Hr and return at a speed of 8 km/hr. If he takes 17 hrs in all. Find the distance from his village to school?