Question
What is the target capacity for hydroelectric projects
by 2031-32, as per the revised scheme?Solution
The target capacity for hydroelectric projects by 2031-32 is set at 31.35 GW, reduced from the earlier target of 75 GW.
If the angular diameter of the sun is 20, how far from the eye a coin of radius 3.3 cm be kept to hide the sun?
If 3, x, y, 48 are in GP and x, y, 45 in AP, find x and y.
The marks obtained by 15 students out of a maximum of 25 in a test are given as 13, 11, 16, 15, 18, 12, 13, 14, 10, 22, 21, 20, 17, and 24. Find the sum...
The sum of first 'n' natural numbers is 465. Find 'n'.
A, B and C invested in partnership. A invest Rs.9000 for 5 months, B invests Rs.7000 for 3 months and C invests Rs.12000 for 2 months. C is working part...
If p = q + 2, where q is the product of six consecutive positive integers, then which of the following is/are true? Â
a. p is a perfect cube
The ratio of length and breadth of a rectangular field is 5:9. If the total cost of surrounding it at the rate of Rs 7.50 per meter is Rs 4200, then fin...
The expenditure-to-savings ratio of an individual 'P' is 5:4. If the person's income rises by 25% and their savings increase by 3...
If the number 9458k2 is divisible by 8, then find the number of possible values of 'k'.
Find the third proportion of 16 and 24.