Question
VA Tech Wabag has secured an order worth about Rs 800
crore towards design, build and operate (DBO) for the reconstruction, expansion and operation of a sewage treatment plant (STP) with a capacity of 200 million litre per day (MLD) in _____.Solution
Chennai-based water technology company VA Tech Wabag has secured an order worth about Rs 800 crore towards design, build and operate (DBO) for the reconstruction, expansion and operation of a sewage treatment plant (STP) with a capacity of 200 million litre per day (MLD) at Pagla in Dhaka. The STP project of Dhaka Water Supply & Sewerage Authority (Dhaka WASA) is funded by multilateral funding agencies like World Bank and Asian Infrastructure Investment Bank (AIIB) under the Dhaka Sanitation Improvement Project (DSIP). The scope of the project includes design, engineering, supply, construction, installation and commissioning of the STP followed by operation and maintenance (O&M) for a period of 60 months.
Find remainder when 7¹³ is divided by 100.

Sum of squares of three consecutive numbers is 770. Find the sum of first and third number.
- Find the greatest value of the expression (p + q), if the number ‘2p618q0’ is divisible by 12.
The sum of two numbers is 30 while the difference between these two numbers is 6. What is 50% of the product of the two numbers?
- The coefficient of 'x 2 ' and 'x' in the expression (Ax + 5) (3 - 2x) are same, where 'A' is a positive integer. (A + 10) is how much percent of...
- Find the median of the following observations:
25, 30, 15, 40, 20, 35, 50 If the number 985212m8 is completely divisible by 11, then the smallest whole number in place of ‘m’ would be:
A number increases by 30 when 60% of it is added to itself. What is the final value after addition?
Find the least 4-digit number which, when divided by 18, 30, and 45, leaves a remainder of 2 in each case.