Question
Consider the following statements : I . The
Maitree Super Thermal Power Project is a 1320MW supercritical coal - fired thermal power plant which has been recently set up at Rampal, Khulna, Bangladesh . II . The project has been developed by Bangladesh - India Friendship Power Company Private Limited ( BIFPCL ) for Bharat Heavy Electricals Limited ( BHEL ) III . The project has been built at an approximate cost of USD 2 Billion . Which statement / statements is / are not correct ?Solution
PM Narendra Modi and Bangladesh Prime Minister Sheikh Hasina have jointly unveiled the Maitree Super Thermal Power Project . The Maitree Super Thermal Power Project is a 1320 MW supercritical coal - fired thermal power plant which has been set up at Rampal, Khulna . Maitree Super Thermal Power Project is being constructed at Rampal in Bagerhat district of Khulna division of Bangladesh . The project has been built under India ’ s concessional financing scheme at an approximate cost of USD 2 Billion . The project has developed by Bharat Heavy Electricals Limited ( BHEL ) for Bangladesh - India Friendship Power Company Private Limited ( BIFPCL ). After both the units of the power plant are made operational, the Maitree Super Thermal Power Project will get the status of being the largest power plant in Bangladesh . About Bangladesh Capital : Dhaka                                     Currency : Bangladeshi taka                      Prime minister : Sheikh Hasina
Feni is made from
Which are of the following describes the characteristics of Sedges?
An extreme modification in the order Diptera, where hind wings are reduced to nubs used for balance and direction during flight is
Rice variety IR–36 belongs to the groups of:
Which soil type is formed under waterlogged conditions and exhibits bluish-grey mottling?
The Backcross method of breeding is used to:
Urea contains:Â
Photosynthesis cycle of C₃ plants isÂ
Match List I with List II:
Choose the correct answer ...
Weed cause relatively more yield loss of rice when the crop isÂ