If 10 men can complete a piece of work in 12 days by working 7 hours a day, then in how many days can 14 men do the same work by working 6 hours a day?
Pipe A can fill the tank 5 times faster than pipe B, if pipe A and B together fill the tank in 50 minutes, then pipe B alone can fill the tank in:
A person from the top of a hill observes a vehicle moving towards him at a uniform speed. It takes 10 minutes for the angle of depression to change from...
A can do (2/5) of a work in 6 days and B can do 30% of the same work in 3 days. They worked together for 4 days. The remaining work was completed by C a...
A, B and C can individually complete a piece of work in 24 days, 15 days and 12 days,respectively. B and C started the work and worked for 3 days and le...
A man can do a piece of work in 30 hours. If he works with his son then the same piece of work is finished in 20 hours. If the son works alone he can do...
'A' and 'B' can finish a task together in 30 days. They worked together for 18 days and then left. The rest of the task was done by 'C' in 12 days. How ...
A contractor assigned a job to three persons A, B and C. βAβ which is 25% less efficient than βBβ can complete 20% of a work in 8 days. βCβ ...
The diameters of three inlet pipes of a cistern are 1.5 cm, 2 cm and 2.5 cm respectively. The pipe with the maximum diameter can alone fill up the ciste...
Numan does half as much work as Gagan in four-fifth of the time. If together they take 16 days to complete a work, how much time shall Gagan take to do it?