_____, a member of the 1967 batch, made it to the position of Financial Commissioner of the Indian Railways Board.
When did the first railway train run on the Indian subcontinent?
Which system manages freight operations in Indian Railways?
The first steam locomotive, No. F-734, was built in 1895 by the _____ workshop of the Rajputana—Malwa Railway.
How many route kilometres of Indian Railways are electrified as per the data till 2024?
The entire length of 256.551 km from Gomoh (Nimiaghat) to Sonnagar (Chiraila Puthu) of the dedicated freight corridor network has been divided into ____...
The first passenger train that ran between Boribunder and Thane, covered a distance of:
What technique is used to stabilize slopes in hilly railway regions?
Which bridge is the world's highest railway bridge?
As on 31 March 2011, the total route length of the broad gauge of the Indian Railways was: