One of the components of Pradhan Mantri Krishi Sinchayee Yojana deals with Creation of new water sources through minor water system, Repair, reclamation, and redesign of conventional water bodies, Charge range advancement, Fortifying and production of dispersion organized from sources to the ranch and Creating and rejuvenating traditional water storage systems. Which of the following Components is the discussion about?
Accelerated Irrigation Benefit Program (AIBP): o To concentrate on speedier fulfilment of continuous Major and Medium Irrigation including National Projects. Har Khet Ko Pani (HKKP): o Creation of new water sources through minor water system (both surface and groundwater) o Repair, reclamation, and redesign of conventional water bodies o Charge range advancement o Fortifying and production of dispersion organized from sources to the ranch and o Creating and rejuvenating traditional water storage systems like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.), etc. at feasible locations. Per Drop More Crop (PDMC): o Improving the efficiency of water usage by various initiatives like precision water application devices, construction of micro-irrigation structures to supplement source creation activities including tube wells and dug wells, etc Watershed Development (WD): o Ridge territory treatment, seepage line treatment, soil and dampness protection, water reaping and other watershed intercessions.
Ashish and Anil can do a piece of work in 15 days and 25 days respectively. Ashish completed 40% of the work. Find the time taken by Anil to complete th...
A man, a woman and a boy can do a work in 4, 8, 32 days respectively. How many boysare required with 1 man and 1 woman to complete the same work in 1/4 ...
P can do a piece of work in 15 days, Q can complete double the work in 40 days and R can do the work in 20 days. If all of them together earn Rs. 3000, ...
‘A’ can do a piece of work in 10 days. ‘B’ can do 80% of the same work in 12 days. If they work together for the entire time and get paid Rs.120...
P, Q & R can finish a work in 10 days, 15 days, and 20 days, respectively, working alone. P and Q work on the first day, P and R work on the second day,...
A can complete a work in 20 days. B takes 10 days less than A to complete the same work. In how many days can both of them together complete 90% of the ...
P can do a piece of work in 20 days, Q can do the same piece of work in 24 days while R can do it in 30 days. They started working together but after 4 ...
In an office, an employee plans to do a work in 20 days with 6 laptops. But after 10 days, he found that only 40% of the work is done with the laptops w...
The time taken by ‘A’ to build a wall alone is 20% more than the time taken by him to build it along with ‘B’. ‘B’ will take how much percen...
‘M’ is 60% more efficient than ‘N’. ‘N’ started the work alone and worked for 20 days and after that ‘N’ is replaced by ‘M’. If the ...