Question
Which soil forming process involves the deposition of
materials removed from eluvial horizons into lower horizons, leading to the creation of illuvial horizons such as Bt?Solution
Illuviation involves the deposition of materials removed from eluvial horizons into lower horizons
Train A of length 150 m is running at 54 km/h and Train B of length 200 m is running at 36 km/h in the opposite direction on parallel tracks. In how man...
A train crosses a pole and a platform of length 396 metres in 6 seconds and 18 seconds, respectively. Find the length of train.
- The length of train 'P' is 'c' metres and that of train 'Q' is (c + 90) metres. If the speeds of train 'P' and 'Q' are 48 km/h and 60 km/h, respectively, a...
Length of a train, whose speed is 84 km/h, is 420 metres. Find the time taken (in seconds) by train to cross a bridge of length 280 metres.
Ratio of the lengths of two trains βXβ and βYβ is 5:6 respectively and the ratio of time taken by them to cross a pole is 3:4 respectively. If s...
A train 120 m long runs at a speed of 54 km/h. How much time will it take to cross a telegraph pole?Β (Use 1 km/h = 5/18 m/s)
A train running at 54 km/h crosses a man running in the same direction at 6 km/h in 18 seconds, and also crosses a bridge in 45 seconds. Find:
(a...
A train crosses a platform in 48 seconds travelling with a speed of 120 km/hr. If the length of the train be 600 metres, then the length (in metres) of ...
Train M, βxβ metres long crosses (x β 34) metres long platform in 15 seconds while train N having the length (x + 34) metres crosses the same plat...
A train can cross a pole in 18 seconds. While if the train increased its speed by 75% then time taken by it to cross 444 metres long platform is 42 seco...