Question
On which of the following floor number does ARUN get
in? Study the following information carefully and answer the below questions There are four floors in an apartment with two lifts Viz., Lift-1, and Lift-2. Lift-1 is to the west of Lift-2. Eight persons-AMAN, ANKIT, ARUN, ARJUN, ARYAN, ASHOK, ASHISH, and ASHWANI are using these two lifts to reach certain floors of the apartment but not necessarily in the same order. The lowermost floor is numbered as 1 and the floor above is numbered as 2 and so on, No two persons use the same lift on the same floor. Only one floor is between AMAN and ASHISH, both are using the same lift. Neither ANKIT nor ARJUN using the lift on the same floor of ARUN. ARJUN is getting into the lift immediately above ASHWANI’s lift. Both ARUN and ARYAN are using the same lift, ARYAN gets in above ARUN. Either ARJUN or ASHWANI is getting into the lift on the same floor of AMAN. ASHOK does not get into the lift on an odd numbered floor. AMAN is getting into the lift on an even numbered floor but not an even numbered lift.Solution
AMAN is getting into the lift on an even numbered floor but not an even numbered lift. Only one floor between AMAN and ASHISH, both are using the same lift. From the above condition, there are two possibilities .
ARJUN is getting into the lift immediately above ASHWANI’s lift. Either ARJUN or ASHWANI is getting into the lift on the same floor of AMAN. From the above condition, there are three possibilities.
ASHOK does not get into the lift on an odd numbered floor. Both ARUN and ARYAN are using the same lift, ARYAN gets in above ARUN.
Neither ANKIT nor ARJUN using the lift on same floor of ARUN From the above condition, Case1 and case2a were dropped. 
Ravi and Rekha, alone can complete a work in 25 days and 50 days, respectively. They started the work together and left after 10 days such that the rema...
A alone can finish a piece of work in 10 days and B alone can finish it in 15 days. They work together for 3 days and the remaining work is finished by ...
P, Q & R can finish a work in 10 days, 15 days, and 20 days, respectively, working alone. P and Q work on the first day, P and R work on the second day,...
(x + 6) workers complete 40% of a job in 8 days by working 5 hours/day. The remaining work is done by (x + 2) workers in 16 days working 5 hours/day. Fi...
Amin, Basha and Cheez can do a piece of work in 90, 40 and 12 days respectively. But they decide. That a single person will work in a day and receive Rs...
138 unit of work can be completed by P alone in 23 days. P started working alone and joined by Q after 11 days such that they completed the remaining wo...
- Two workers, A and B, can finish a task in 36 days and 48 days respectively, working alone. How many days will they take to complete the work together?
- Pipes X and Y can fill a tank in 45 minutes and 60 minutes respectively. Another pipe Z can empty the tank in 1 hour 30 minutes. If X and Z are opened firs...
8 men working 6 hours a day can complete a piece of work in 6 days. If efficiency of each woman is 20% more than that of each man, then how many women w...
- Alok finishes 60% of a project in 30 days, while Neha finishes 20% of the same in 15 days. Alok worked for 25 days and then stopped. Find the time taken by...