Question
What is the position of box F?
Answer the questions based on the information given below. There are 7 boxes A, B, C, D, E, F, and G kept one above the other. The bottommost box is numbered as 1 and the topmost box is numbered as7. Box C is kept at 4th position from the bottom. Two boxes are kept between box D and box C. Box F is kept adjacent to box D. Box G is kept immediately above box B, which is kept in an even-numbered position. Box A is kept above box E, and more than two boxes are kept between them.Solution
Box C is kept at 4th position from the bottom. Two boxes are kept between box D and box C. Box F is kept adjacent to box D. Box G is kept immediately above box B, which is kept on an even-numbered position.
Box A is kept above box E, and more than two boxes are kept between them. So the final arrangement becomes: 
'Ramesh' can complete a work in 40 days. He started the work and left after 24 days from starting. The remaining work was done by 'Suresh' in 30 days. F...
The amount of work completed by 24 men in 5 hours is equivalent to the work done by 21 women in 8 hours. A team of 33 men, working 6 hours daily, can fi...
There is enough food in a camp to last for 30 days if each of the 100 soldiers present at the camp eat 3 times a day. After 20 days, 50 soldiers left t...
‘A’ and ‘B’ can do a piece of work in 15 days and 20 days, respectively. They started working together but ‘A’ left after 3 days. Find the t...
Ajay, Bablu and Chirag can complete a certain work in 21, 28 and 15 days respectively. Ajay and Chirag started the work while Bablu joined them after 5 ...
Akhil and Nikhil together can complete a work in 9 days while Nikhil alone takes 12 days to complete 50% of the work. If the efficiency of Sachin is 20%...
‘X’ is 25% more efficient than ‘Y’, and ‘Z’ is 25% less efficient than ‘Y’. Together, they can complete a job in 40 days. If X and Y wor...
P can do a piece of work in 20 days, Q can complete double the work in 40 days and R can do the work in 30 days. If all of them together earn Rs. 3200, ...
A and B can complete a work together in 30 days. If A alone can complete one-third of the work in ‘x’ days and remaining work is completed by B alon...
A can complete a piece of work in 12 days and B can complete the same work in 18 days. They work together for 4 days and then leave the remaining work ...