Question
___ lives immediately above D in the same type of
flat. Answer the questions based on the information given below: Ten persons (A, B, C, D, E, F, G, H, I and J) live on 10 different flats of a 5 storey building, where the bottommost floor is 1 and the floor above is 2 and so on. There are 2 types of flats on each floor, flat A and flat B such that flat A is in the west of flat B. Flat A of floor 1 is immediately below of flat A of floor 2, which is immediately below of flat A of floor 3 and so on, similarly for flat B. The dimensions of each of the flats is same There are two floors between the floors of J and G (both of them may or may not live in the same type of flat). J lives on first floor. J lives south west of B. F lives 2 floors above B (both live in the same type of flat). D lives immediately above floor H, who doesn’t live anywhere below B’s floor. A lives above D’s floor but not in flat A. E doesn’t live on a prime numbered floor. C doesn’t live immediately above B.Solution
1. There are two floors between the floors of J and G (both of them may or may not live in the same type of flat). J lives south west of B. J lives on first floor. 2. F lives 2 floors above B (both live in the same type of flat). 3. D lives immediately above H, who doesn’t live below anywhere B’s floor. So, G must live above J’s floor either in flat A or B. Both F and B live in flat B. Case 1: When G lives in the flat B. 4. A lives above D’s floor but not in flat A. E doesn’t live in a prime numbered floor. C doesn’t live immediately above B. So, A lives in on 5th floor in flat B. Case 2(b): When both G and J live in the same flat and J live on 1st floor. The final arrangement is as follows:
A can finish a piece of work in 12 days and B can finish it in 18 days. They work together for 4 days, after which B leaves. In how many more days will ...
A contractor planned to complete a project in 5 days by employing ‘a’ workers. But every day exactly 15 workers were absent. As a result, the work g...
Three men A, B, and C working together dig 648 m deep in six days. C digs as many meters more than B. B digs as many meters more than A. Then how much d...
- If the efficiency ratio of A, B, and C is 7:9:11, and B and C together can finish a task in 10 days, then how much time will A and B need to complete it?
A can complete a piece of work in 10 days and B can complete it in 15 days. They start working together, but B leaves after 3 days. In how many more day...
- Armaan can complete a task in 36 days, Bittu in 45 days, and Chirag in 60 days. If Bittu and Chirag together work on the task for 10 days, how many additio...
Efficiency of A, and B are in the ratio of 2 : 3. If both can do a work together in 60 days. Find out how much days A will take to complete the work alone?
A alone can finish a piece of work in 10 days and B alone can finish it in 15 days. They work together for 3 days and the remaining work is finished by ...
A can do a work in 15 days and B in 10 days. They work together for 3 days. What fraction of the work is left?
A and B can complete a piece of work in 12 days and 15 days respectively. They start working together, but after 4 days, A leaves. In how many more days...