Question
Rohit and Mohit can do a piece of work in 4 days. While Ram and Shyam can do the same work in 12 days. In how many days will Rohit, Mohit, Ram and Shyam do it together?
More Previous year papers Questions
- Average of 20 numbers is 90. Average of first 8 numbers is 114 while average of last nine numbers is 40. If ninth number is 25% less than the tenth number ...
- The volume of a right circular cylinder is 1792π cmᶟ and its radians is 16 cm. What is the curved surface area tin cm²) of the cylinder?
- Two cars are travelling from the same location, moving in the same direction at speeds of 6 km/h and 4 km/h. respectively, starting at the same time. Calcu...
- If the least common multiple (LCM) and greatest common multiple (HCF) of two numbers are 96 and 8 respectively, and their sum is 56, then the sum of the re...
- A sum of Rs. 10,000 is borrowed by Akshit for 2 years at an interest of 10% compounded annually. Find the compound interest and amount he has to pay at the...
- Find the simple interest (in ₹) on ₹2500 as a sum borrowed at 7% per year rate of interest for 2 years.
- Evaluate the following: 5 – [96 ÷ 4 of 3 – (16 – 55 ÷ 5)]
- Atul gives Vishu a head-start of 20 seconds in a 900 m race and beats him by 135 m. While running the same race again Atul gives a start of 189 m and beats...
- Find the quotient, when the mean proportional of 7(1/2) and 245 is divided by an even prime number.
- If 3 goats or 5 sheep can graze a field in 54 days, then in how many days can 6 goats and 8 sheep graze the same field?
Relevant for Exams:
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt
Think You're Ready for RBI Grade B?
RBI Grade B 2026 Phase 1 Memory Based Paper
- 200 Questions with Detailed Solutions
- Section-wise Coverage (GA, English, Quant & Reasoning)