Question
Rohit and Mohit can do a piece of work in 4 days. While Ram and Shyam can do the same work in 12 days. In how many days will Rohit, Mohit, Ram and Shyam do it together?
More Previous year papers Questions
- Two solutions A and B contain spirit and water in the ratio 5 : 1 and 7 : 2 respectively. In what ratio should A and B be mixed so that the resulting solut...
- Which of the following statement(s) is/are correct?
- Sachin sold 152 chairs and had a gain equal to the selling price of 52 chairs. What is his profit percentage?
- Which of the following number is not divisible by 9?
- A man observed the top of an electric pole at angles of elevation of 60° and 30°, respectively, from two different observation points P and Q. If the dista...
- Anjali and Ritu appeared in an examination. Anjali secured 20 marks more than Ritu and her marks was 70 percent of sum of their marks. How much did Anjali ...
- The average of five numbers is 87.8. The average of the first two numbers is 81.5 and the average of the last two numbers is 93.5. What is the third number...
- The price of edible oil is first reduced by 20%. Then the reduced price is increased by 20%. If the new price is ₹ 20 less than the original price, find th...
- A person travels to a certain place at a speed of 30 km/h and returns to the starting place at a speed of 20 km/h. Find his average speed (in km/h) during ...
- In a right triangle, if the hypotenuse is 24 cm and the side opposite to the 30° angle is 12 cm, then what will be the length of the side opposite to the 6...
Relevant for Exams:
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt
Think You're Ready for RBI Grade B?
RBI Grade B 2026 Phase 1 Memory Based Paper
- 200 Questions with Detailed Solutions
- Section-wise Coverage (GA, English, Quant & Reasoning)