Start learning 50% faster. Sign in now
There are 9 triangles (ACM, ACH, ABI, HIJ, LKI, LOH, DAN, AHM and DCP) in the given figure.
If one child has half the work efficiency of an adult, determine the duration required for 8 children to construct a wall, which is 60% as large as the ...
‘A’ alone can complete a work in 40 days while ‘A’ and ‘B’ together can complete the same work in 30 days. How much ...
A and B together can do a piece of work in (p-8.8) days.The efficiency of D is 10% less than the efficiency of B. A and C together can do the same piece...
Karan can do 80% works in 40 days. Remaining work completed by Karan and Arjun in 6 days. In how many total days the total work is finish if Arjun work ...
P and Q together can do a piece of work in 15 days, Q and R together can do it in 18 days. P starts the work and works on it for 5 days, then Q takes it...
'A' is capable of completing a specific task on their own in 20 days. 'B' can independently handle 60% of the same task in 18 days. If 'A' and 'B' colla...
A and B can do a piece of work in 16 days and 18 days respectively. A started the work alone and after 4 days B also joined and continued till the work ...
‘A’ and ‘B’ can do a piece of work in 17 days and 34 days, respectively. They started working together but ‘A’ left after 4 days. Find the t...
A can complete a work in 20 days. B takes 10 days less than A to complete the same work. In how many days can both of them together complete 90% of the ...
‘M’ is 60% more efficient than ‘N’. ‘N’ started the work alone and worked for 20 days and after that ‘N’ is replaced by ‘M’. If the ...