Question
The Indian Railways will float global tenders worth over
₹100 crore for acquiring sophisticated equipment to run 1,000 trains without guards. The End of Train Telemetry (EoTT) equipment is used to establish communication between the locomotive driver and the last wagon of the train to ensure that the train is running with all coaches/wagons as a complete unit. The equipment is designed to do the guard’s job by giving indication to the loco driver in case of parting of coaches or wagons from the rear side of the train. Each set of EoTT device is estimated to cost approximately ₹10 lakh. EoTT system comprises two units — one unit called cab display unit (CDU) fitted on the locomotive and the other is sense and brake unit (SBU) fitted on the last coach or wagon of the train. A paragraph has been provided. From the options given below, choose the sentence that continues the paragraph in the most appropriate waySolution
The correct answer is D
Which of the following is the largest railway junction in India?
The Konkan Railway was formed in the year:
Diesel locomotives are built in?
Railway construction in India began in:
Which factory of the Indian Railways is located at Bengaluru?
Which railway station has received the first green Platinum rating in 2019?
The Commission of Railway Safety comes under which of the following ministries?
A horse-drawn tramway began operation in Bombay between Colaba and Parel in the year:
First Train started in India?
Where is the Centre for Railway Research (Vehicle Dynamics, Heavy Haul & High-Speed Technology) located?