Question
The Indian Railways will float global tenders worth over
₹100 crore for acquiring sophisticated equipment to run 1,000 trains without guards. The End of Train Telemetry (EoTT) equipment is used to establish communication between the locomotive driver and the last wagon of the train to ensure that the train is running with all coaches/wagons as a complete unit. The equipment is designed to do the guard’s job by giving indication to the loco driver in case of parting of coaches or wagons from the rear side of the train. Each set of EoTT device is estimated to cost approximately ₹10 lakh. EoTT system comprises two units — one unit called cab display unit (CDU) fitted on the locomotive and the other is sense and brake unit (SBU) fitted on the last coach or wagon of the train. A paragraph has been provided. From the options given below, choose the sentence that continues the paragraph in the most appropriate waySolution
The correct answer is D
What is a common reason for implementing job changes in an organization?
What is the relationship between tolerance and acceptance?
What does temperance entail in personal behavior?
How does organizational structure influence the development of an ethical culture within a company?
What do terminal values represent?
Impartiality is characterized by:
In the context of management, what is the purpose of control?
What is a recommended strategy for developing emotional intelligence?
Which communication channel is characterized by the direct exchange of information between two individuals?
How are ethics and organizational structure intertwined?