Question
Select the option in which the numbers are related in
the same way as are the numbers of the following sets. Â (11, 13, 72) (19, 12, 93) Â (NOTE: Operations should be performed on the whole numbers, without breaking down the numbers into its constituent digits. E.g. 13-Operations on 13 such as adding /deleting /multiplying etc. to 13 can be performed. Breaking down 13 into 1 and 3 and then performing mathematical operations on 1 and 3 is not allowed)Solution
The logic followed here is: (1st number + 2nd number) x 3 = 3rd number. (11, 13, 72) → (11 + 13) x 3 = 72 → 24 x 3 = 72 → 72 = 72 (19, 12, 93) → (19 + 12) x 3 = 93 → 31 x 3 = 93 → 93 = 93 Now, checking the options: Option (B): (15, 23, 114) (15 + 23) x 3 = 114 38 x 3 = 114 114 = 114  Hence, the correct answer is (B).
P alone can finish a piece of work ‘M’ in 6 days while Q takes 3 days to finish it alone. P, Q and R working together can finish the work &l...
- Person A is twice as efficient as Person B. Person B can complete a certain task in 32 days, while Person C takes 4 days more than Person A to finish the s...
‘A’ can do a piece of work in 15 days. ‘B’ can do 70% of the same work in 20 days. If they work together for the entire time and...
Person A is 80% more efficient than person B. A and B together can complete a certain task in 10 days, while B and C together can complete the same task...
'A' and 'B' can do a piece of work together in 30 days. They worked together for 18 days, and then left the work. The remaining job was finished by 'C' ...
A can complete a piece of work in 24 days. He worked for 21 days and then B finished the remaining work in 6 days. In how many days can A and B finish t...
Vijay can do a piece of work in 10 days and Sanjay can do the same work in 15 days. If Vijay works for 4 days and got Rs. 1680, and the remaining work w...
- 'Amit', 'Ravi', and 'Neha' can finish a piece of work in 66, 99, and 132 days respectively. They all started the work, but Amit left 8 days before the work...
- Ritu completes 50% of a project in 25 days, while Sheetal completes 40% in 32 days. Ritu works for 30 days and then stops. Find the time Sheetal needs to f...
X can do a piece of work in 22 days. He worked at it for 11 days and then Y finished it in 15 days. In how many days can X and Y together finish the work?