Question
A train takes 24 seconds to pass a pole and 34 seconds
to completely cross a tunnel that is 300 metres long. How much time will a motorbike, moving at 60 m/s in the same direction, take to pass the train?Solution
ATQ,
Let the length of the train = ‘L’ metres Distance covered by the train in 24 seconds = ‘L’ metres Distance covered by the train in 34 seconds = (L + 300) metres So, distance covered by the train in (34 – 24) seconds = L + 300 – L = 300 metres So, speed of the train = (300 / 10) = 30 m/s So, length of the train = 30 × 24 = 720 metres Relative speed of the motorbike with respect to the train = 60 − 30 = 30 m/s So, time taken by the motorbike to cross the train = (720 / 30) = 24 seconds
A lender’s portfolio of unsecured retail loans shows a moderate uptick in 30-day delinquencies and a macro overlay indicating deterioration in borrowe...
A company has ₹10 lakh in equity and ₹10 lakh in 10% debt. EBIT is ₹4 lakh and tax rate is 30%. What is the financial leverage?
Any casual vacancy in the office of an auditor shall in the case of a company whose accounts are subject to audit by an auditor appointed by the Comptro...
A company has a paid-up share capital of ₹80 lakh and free reserves of ₹120 lakh. It plans to buy back 25% of its paid-up equity shares. The face va...
As per the Nayak committee, what percentage of its annual projected turnover should an MSME get as working capital from a bank?
The time limit for applying for GST registration is within __________ of becoming liable to obtain GST registration.
A solvency margin breach is cured via capital infusion after reporting date but before approval. How to report?
What is the amount which is allowed as standard deduction under section 16 from Gross salary while computing the Income under head salary?
A company sets a standard cost of ₹50 per unit. Actual cost was ₹55 per unit for 1,000 units. The material price variance was ₹3,000 (A) and usage...
How do Priority Sector Lending (PSL) compliance requirements differ between foreign banks with 20 or more branches and those with fewer than 20 branches?