Question
Karan can do 60% of a job in 36 days while Meena does 20%
in 18 days. Karan works for 20 days and stops. Calculate how many days Meena will take to complete the rest of the work.Solution
ATQ,
Time taken by Karan to complete whole work = (36 / 0.60) = 60 days
Time taken by Meena to complete whole work = (18 / 0.20) = 90 days
Let the total work be 180 units (LCM of 60 and 90)
Efficiency of Karan = (180 / 60) = 3 units/day
Efficiency of Meena = (180 / 90) = 2 units/day
Work completed by Karan in 20 days = 20 × 3 = 60 units
Remaining work = 180 - 60 = 120 units
Therefore, required time = (120 / 2) = 60 days
What does soil pH primarily measure in terms of soil acidity?
Lactose sugar of milk is converted into Lactic acid by
Which instrument is used to measure Relative Humidity accurately in their crop canopy?
What is the tagline of Eat Right India?
Which part of the engine is used to transmit power from the piston to the crankshaft?
The web enabled workflow based information system developed for the MIDH ?
Which of the following is correctly matched ?
The Cabinet Committee on Economic Affairs has approved Fair and Remunerative Price (FRP) of sugarcane as ____ (Rs/quintal) for sugar season 2022-23.
Cuttings of black pepper are raised mainly from
Which of the following is not a major pigment of photosynthesis?