Start learning 50% faster. Sign in now
Let total amount of work be 20 units
Efficiency of (A + B) = 20/10 = 2 units/day
Efficiency of ‘B’ = 20/20 = 1 unit/day
Amount of work done by ‘B’ = 15 × 1 = 15 units
Percentage of work done by ‘A’ = {(20 – 15)/20} × 100 = 25%
For α- amylase production the micro-organism required is
Element that act as an antioxidant and have synergistic effect with Vitamin E is
Which of the following microorganisms cannot tolerate oxygen?
In cucumber, chilling injury symptoms occur at:
In which of the following method, heating is due to electrical resistance of a food
Which of the following is the most fermentable sugar?
Iodized salt contains iodine in the form of:
Mold inhibitor used in bread is:
Which of the following fats increases heart disease risk?
Enzyme hydrolyzing bacterial cell wall is called