ATQ,
Time taken by 'Bhavna' to complete the work = 28 + 7 = 35 days Let the total work be 140 units (LCM of 28 and 35) Efficiency of 'Pawan' = (140/28) = 5 units/day Efficiency of 'Bhavna' = (140/35) = 4 units/day Work completed by 'Pawan' and 'Bhavna' in 10 days = (5 + 4) × 10 = 90 units Remaining work = 140 - 90 = 50 units So, efficiency of 'Raja' = 50/5 = 10 units/day Therefore, time taken by 'C' to complete the entire work = 140/10 = 14 days
Select the set in which the numbers are related in the same way as are the numbers of the following sets.
(NOTE: Operations should be performed o...
Identify the number that does NOT belong to the following series.
46, 54, 81, 145, 270, 480
Select the figure from among the given options that can replace the question mark (?) in the following series.
Which two numbers and two signs should be interchanged in the following equation to make it correct?
4 + 2 ÷ 7 + 8 × 9 = 25
In the given letter-cluster pairs, the first letter-cluster is related to the second letter-cluster following a certain logic. Study the given pairs ca...
If all the letters in the word ‘RESPECTIVE’ are arranged in alphabetical order from left to right such that the vowels are arranged first followed b...
Select the option that is related to the third term in the same way as the second term is related to the first term.
Electric Current : Electric ...
‘A + B means "A is the son of B, A – B means A is the daughter of B’, A × B' means 'A is the mother of B. 'A ÷ B means "A is the brother of B�...
Select the letter cluster that will come next in the following series.
MNOP, HIJK, _______
In a certain code language, 'STATE' is written as '38401405' and 'EXILE' is written as 5489245'.How will ‘ARENA’ be written in that language?