Question
'A' can do 50% of work in 10 days, whereas 'B' can do
25% of the same work in 8 days. 'A' and 'B' started the work, but 'B' left the work 'n' days before completion of work. If the whole work is completed in 15 days, then find the value of [0.8n + (n²/10) ].Solution
ATQ, Time taken by 'A' to complete the entire work = (10/50)×100 = 20 days Time taken by 'B' to complete the entire work = (8/25 )×100 = 32 days Let the total work be 160 units (LCM of 20 and 32). Efficiency of 'A' = 160/20 = 8 units/day Efficiency of 'B' =160/32 = 5 units/day ATQ, (8×15)+{5×(15−n)} = 160 120+(75−5n) = 160 195−5n = 160 5n = 35 n = 7 Therefore, required value =
What is the distance between T and P?

Aman starts from point A and drives 22 km towards the north. He takes a right turn and drives 50 km to reach X. He then drives 18 km after taking a left...
Anita is standing facing the north direction. Then, she turns 135° anticlockwise. After that, she turns 90° clockwise. In which direction is she facin...
Mita started walking towards North. After walking 25 metres she turned right and walked 20 meters and took a left turn and walked 5 meter. In which dire...
- A man is walking towards west. He walks 15m, then turns left and walks 5m. Again he turns to his left and walks 10m. Finally, he turns to his right and wal...
S is in which direction with respect to V?
Uma went 18 Km to the West from my house, then turned left and walked 22 Km. She then turned East and walked 32 Km & finally turning left covered 22 Km...
What is the shortest distance between Sanju and Ankit?
What is the shortest distance between point M and point D?