Question
Rohan can finish a task alone in 24 days. Shreya can do
50% of the same task alone in 12 days. If Shreya and Tanya work together, they can complete 60% of the task in 9 days. Find the time taken by Rohan and Tanya to finish the task together.Solution
ATQ, Time taken by Shreya to do the entire task = 12 ÷ 0.5 = 24 days Time taken by Shreya and Tanya to do the entire task together = 9 ÷ 0.6 = 15 days Let the total work be 120 units {LCM (24, 24, and 15)} So, the combined efficiency of Shreya and Tanya = 120 ÷ 15 = 8 units/day Efficiency of Shreya = 120 ÷ 24 = 5 units/day Efficiency of Tanya = 8 - 5 = 3 units/day Efficiency of Rohan = 120 ÷ 24 = 5 units/day So, required time taken = 120 ÷ (5 + 3) = 120 ÷ 8 = 15 days
The “Nutrient Index” concept in soil fertility assessment was introduced by:
The Phenomenon of inheritance of linked genes in same linkage group is called as
Which of the following statement is not correct about the facilitated diffusion?
Water movement under unsaturated soil conditions is mainly driven by_____
Which insect lays eggs in guava fruits, causing damage and rendering them unmarketable?
In furrow irrigation, which factor mainly influences the uniform distribution of water?
Karonda is a rich source of
The process of loss of water from plant is
Why are insects considered among the most successful organisms on Earth in terms of survival and proliferation across ecosystems?
In which part of India the shifting cultivation, locally known ‘Jhuming’ is widely practiced?