Question
βAβ can do 30% of the work in 12 days. βBβ can
do the whole work in 50 days. Find the time taken by them together to do 75% of the work.Solution
Time taken by βAβ to complete the whole work. = 12/0.30 = 40 days Time taken by βBβ to complete the whole work. = 50 days Let total work = 200 units (LCM of 50and 40) Efficiency of βAβ = 200/40 = 5 units/day Efficiency of βBβ = 200/50 = 4 units/day required time taken = (.75Γ200)/ (5+4) =150/9=16.66days
The IFOAM is the worldwide umbrella organization for the organic agriculture movement, which represents close to 800 affiliates in 117 countries. What d...
All phenomenon of weather and climate takes place in
Botanical name of oats is
If a farmer aims to break hard pans in the soil without inverting it and with minimal disturbance to the topsoil, which method of tillage is most suitable?
Which method of plant breeding involves Crossing to plants with desirable traits followed by self-pollination?Β
Which soil type cover the maximum area in lndia?
Which of the following devices can be considered part of the internet of things (IoT)
Which method is commonly used to determine the soil texture?
Extrachromosomal DNA can be found inΒ
Lactose found in milk is a disaccharide composed of: