Start learning 50% faster. Sign in now
Time taken by ‘A’ to complete the whole work. = 12/0.30 = 40 days Time taken by ‘B’ to complete the whole work. = 50 days Let total work = 200 units (LCM of 50and 40) Efficiency of ‘A’ = 200/40 = 5 units/day Efficiency of ‘B’ = 200/50 = 4 units/day required time taken = (.75×200)/ (5+4) =150/9=16.66days
Which of the following State/ UT has been declared as 'Free Area' for purposes of Prevention and Control of Infectious and Contagious Diseases in Animal...
At Stage II of production, the elasticity of production is
The type of germination observed in pigeon pea?
Pusa Meghna, Pusa Shubhra and Pusa Snowball are the varieties of which vegetable crop?
The type of germination observed in pigeon pea?
While using Aluminium Phosphide which of the following things should be kept in mind?
Laggards constitute ………………..% of total Indian Population.
A situation when the rainfall deficiency is 25% or more of long term average, it is classified as
Detasseling is done in maize to ______
India’s first digitally literate village panchayat located in which of the following state?