‘M’ is 60% more efficient than ‘N’. ‘N’ started the work alone and worked for 20 days and after that ‘N’ is replaced by ‘M’. If the total work is completed in 25 days, find the time taken by ‘M’ to finish the same work alone?
Let the efficiency of ‘N’ = ‘5x’ units/day Efficiency of ‘M’ = ‘8x’ units/day Time taken by ‘M’ to complete the remaining work = 25 – 20 = 5 days Total work = 20 × 5x + 5 × 8x = 140x units Desired time = 140x/8x = 17.5 days
The nematodes, as a rule, are bisexual existing as separate:
Which bacterium is responsible for denitrification in N2 cycle?
The length of time that a herbicide remains active in the soil is called
Indicator plant for boron deficiency in soils.
Which of the following is the chief characteristic of ‘mixed farming’? (2012)
Which of the following crop is a source methane and nitrous oxide emission into the atmosphere?
Tips of ecological pyramid is occupied by
When is the first harvest of geranium typically done after planting?
Which of the following alkene is used in the manufacture of polythene?
Tryptophan is the precursor of