Start learning 50% faster. Sign in now
Let the work ‘A’ and ‘B’, can do in 1 day be ‘a’ units and ‘b’ units, respectively. Let they takes ‘p’ days to build the wall, together Therefore, Total work = (a + b) × p units …….. (1) According to the question, Time taken by ‘A’ to build the wall alone = 1.4p days Therefore, total work = 1.4p × a units….. (2) From equation (1) and (2), we get 2.5b = a Therefore, total work to be done = (a + b) × p = 3.5bp units Time taken by 'B' to build the wall = 3.5bp/b = 3.5p days Therefore, required percentage = (3.5p – p)/p} × 100 = 250% more time
According to John Maynard Keynes, which one of the following statements is correct for a closed economy operating at less than full employment level of ...
Hedonic pricing is a method used for environmental valuation that:
What is the Standard deviation of first 50 natural numbers
In Durbin-Watson test, if the value of d is 4, then what is the characteristic of the autocorrelation
Which of the following activities can be undertaken by a payment bank in India, as per RBI guidelines?
(i) Acceptance of demand deposits
...What happens in long run under monopolistic competition?
Which of the following statements about graphs of short-run cost curves is false?
According to the Mundell-Fleming model for a small open economy with flexible exchange rates, if the Federal Reserve cannot alter domestic int...
Which of the following would shift the ‘Marginal Efficiency of Investment’ (MEI) schedule to the right?
By _____________ economists refer to an unanticipated inflation that reduces the real value of outstanding government debt.