Question
The time taken by βAβ to build a wall alone is 45%
more than the time taken by him to build it along with βBβ. βBβ will take how much percent more time to build the same wall than the time taken by him to build it along with βAβ?Solution
Let the work βAβ and βBβ, can do in 1 day be βaβ units and βbβ units, respectively. Let they takes βpβ days to build the wall, together Therefore, Total work = (a + b) Γ p units β¦β¦.. (1) According to the question, Time taken by βAβ to build the wall alone = 1.45p days Therefore, total work = 1.45p Γ a unitsβ¦.. (2) From equation (1) and (2), we get 20b/9 = a Therefore, total work to be done = (a + b) Γ p = 29bp/9 units Time taken by 'B' to build the wall = 29bp/9b = 29p/9 days Therefore, required percentage = (29p/9 β p)/p} Γ 100 = 222.22% more time
40 men can complete a piece of work in 48 days. βxβ men started the work and after 30 days 56 more men joined them so that whole work was finished i...
A, B, and C are hired to complete a task. A and B together can finish the work in 12 days, B and C together in 15 days, and A and C together in 20 days....
4 men and 6 women together or 8 men can complete a piece of work in 20 days. 6 men and 6 women will complete the same work in
P and Q can complete a piece of work individually in 12 days and 20 days, respectively. They start working together, but after 6 days, Q leaves the work...
A team leader can do a job as fast as three members of the team working together. If one of the member can do the job in 5 hrs, the second one takes 10 ...
A can finish a piece of work in 15 days and B can finish it in 20 days. They work together for 4 days and then B leaves. In how many more days can A alo...
A can complete a work in 40 days. B takes 20 days less than A to complete the same work. In how many days can both of them together complete 60% of the ...
David can complete a work alone in 30 days, while Ethan can complete the same work in 50 days. Both of them started the work together and worked till 96...
A and B can each finish a task in 32 days and 36 days respectively. They begin the task together, but after 12 days, A leaves. How long will it take for...
A man, a woman and a boy can do a work in 3, 2, 6 days respectively. How many children were required with 1 man and 1 woman to complete the same work in...