Question
A work can be completed by ‘A’ and ‘B’, alone in
10 days and 14 days, respectively. Find the number of days taken by ‘C’ to complete the same work alone if ‘A’, ‘B’ and ‘C’ together can complete the whole work in 5 days.Solution
Let total work = 70 units (LCM of 10 and 14) Efficiency of ‘A’ = (70/10) = 7 units/day Efficiency of ‘B’ = (70/14) = 5 units/day Combined efficiency of ‘A’, ‘B’ and ‘C’ = (70/5) = 14 units/day Efficiency of ‘C’ = 14 – (7 + 5) = 2 units/day Required time taken = (70/2) = 35 days
A phenomenon in degradation process wherein an intermediate product of herbicides proves more phytotoxic than the parent compound
Plastids that contain high concentrations of carotenoid pigments rather than chlorophyll pigments are
The intersection of the demand and supply curves indicates the equilibrium:
Moisture availability index of 0.34 to 0.67 indicates which of the following class?
Maximum amount in oilseeds are produced in which state in India?
BIS is the national standard body under the Ministry of_____?
What is maximum optimal temperature for wheat crop?
Which organelle acts as repository of genetic information and is also the cell's control center?
Goitrogens is present in
What is the absorption of ions in plants occurring with the aid of metabolic energy called?