Question
A alone can complete 40% of a work in 16 days while B
takes 12 days more than A to complete it. If B and C together can complete the work in 20 days, then find the time taken by C alone to complete the same work.Solution
Time taken by A alone to complete the entire work = 16/0.4 = 40 days Time taken by B alone to complete the entire work = 40 + 12 = 52 days Let the total work = L.C.M of 40, 52 and 20 = 520 units Then, efficiency of B = (520/52) = 10 units/day Combined efficiency of B and C = (520/20) = 26 units/day So, efficiency of C alone = 26 – 10 = 16 units/day So, time taken by C alone to complete the entire work = (520/16) = 32.5 days
Ricinine, a toxic alkaloid, which can serve as a biomarker of ricin poisoning, is generally found in which of the following plants?Â
Which state has covered largest area under organic certification?Â
In PMFBY, the threshold yield is calculated by multiplying average yield with ___
Orobanche is a problem weed in
Anaerobic respiration is called as
Match List I with List II
Choose the correct answ...
Animals that possess notochord during the embryonic period which later replaced by a cartilaginous or bony vertebral column are called vertebrate animal...
The maximum amount of energy is liberated on oxidation of ____
Which of the following nutrient element is immobile in soil but mobile in plants ?
In conservation tillage, the minimum land surface covered by crop residues is