A and B individually can complete the work in 30 days
and 45 days respectively. If the time taken by C alone to complete the work is 1.5 times the time taken by A and B together to complete the work, find the time taken by C to complete the work while working alone.Solution
Time taken by A and B together to complete the work = (30 × 45)/ (30 + 45) = 18 days Time taken by C alone to complete the work = 1.5 × 18 = 27 days
Which of the following is NOT a layer of the Internet Protocol Suite (TCP/IP)?
A set trigger, such as a preprogrammed date or time, activates which type of threat?
Which of the following function(s) is/are not present in the number keypad of keyboard?
 Which out of the following is the correct full form of VoIP?
DMA stands for
Which of the following is used by the browser to connect to the location of the Internet resources?
The Internet utilizes the TCP/IP  protocol  and is accessed using a computer modem  or network that is connected through an ISP . What is th...
Which of the following short cut key(s) is used to select current column completely?
Pokemon Go uses which of the following ?
Which of the following hardware can provide Firewall security?