Question
A and B together can do a work in 12 days. If A can
alone do the same work in 18 days, then in how many days B alone will do the same work?Solution
Total work = Number of days × 1 day’s work (efficiency) Total work = LCM (12, 18) = 36 unit 1 day’s work of (A+B) = 36/12 = 3 unit 1 day’s work of A = 36/18 = 2 unit 1 day’s work of B = 3 - 2 = 1 unit Now, Time taken by B to completed the work = 36/1 = 36 days
Compared to humans, why do insects display remarkable physical strength relative to their body size?
A shoot with a different color flower or leaf may arise in a group of plants and is termed asÂ
Raphanus sativas L is the botanical name of:
Family cecidomyidae belongs to order:
What is the meaning of the term vigor in seed propagation?
…………. are formed from deposits of pre-existing rocks or pieces of once-living organism that accumulate on the Earth's surface.
The primary function of Regional Rural Banks (RRBs) in India is to:
Pusa Deepali is a variety of:
Stevenson screen is used along with an instrument for obtaining an accurate result. Which instrument?
India is known as the land of