Question
Working alone, B can complete the work in 30 days. C is
twice as efficient as B and A takes 3 days more than it takes C to complete the work. Working together, in how much time would they be able to complete 7 such works?Solution
Time taken by B to complete the work = 30 days Time taken by C to complete the work = 30/2 = 15 days Time taken by A to complete the work alone = 15 + 3 = 18 days Work done by A, B and C together in 1 day. β (1/30 + 1/15 + 1/18) = (3 + 6 + 5)/90 = 14/90 this means if would take 45/7 days for A, B and C to complete the work together β΄ Time taken A, B and C to complete 7 works = 7 Γ 45/7 days = 45 days
If the average of two numbers is 13 and the square root of their product is 12, then the difference between the numbers is:
What is the smallest natural number that should be added to 1030 so that the square root of the sum is a natural number?
A horse is tethered to a peg fixed at one corner of a rectangular grass field measuring 45 metres in length and 25 metre...
Determine the value of (0.88)2Β
Find the square root of 0.0324.
Two times a number, added to the square of that number, gives 3. What could be the possible answer for this number?
Find the Square root of β14641
Calculate the lateral surface area of a right circular cone having a radius of 5 cm and a height of 12 cm.
Find the value of β 474552
Solve the following :-