Question
X can do a piece of work in 15 days. He worked at it for
3 days and then Y finished it in 16 days. In how many days can X and Y together finish the work?Solution
X’s three day work = 3/15 = 1/5. Remaining work = 1 – 1/5 = 4/5 This work was done by Y in 16 days. Y does 4/5th of the work in 16 days, he will finish the work in 16 × 5/4 = 20 days. X & Y together would take 1/20 + 1/20 = 2/20 = 1/10 i.e. 10 days to complete the work.
Predict the correct output

What is the decimal equivalent of the binary number 10101?
What data structure is commonly used to represent the parse tree in parsing?
In big data analytics, what is the process of identifying and correcting errors or inaccuracies in the collected data?
Which type of transistor is less susceptible to thermal runaway?
Deleting top element of stack?
Comparing two strings by using which function?
In virtual circuit network each packet holds ___________
Which type of neural network architecture is specifically designed to process data with a variable-length sequence?
Which concurrency control technique uses read and write locks to ensure consistency?