Question
X can do a piece of work in 15 days. He worked at it for
3 days and then Y finished it in 16 days. In how many days can X and Y together finish the work?Solution
X’s three day work = 3/15 = 1/5. Remaining work = 1 – 1/5 = 4/5 This work was done by Y in 16 days. Y does 4/5th of the work in 16 days, he will finish the work in 16 × 5/4 = 20 days. X & Y together would take 1/20 + 1/20 = 2/20 = 1/10 i.e. 10 days to complete the work.
Aluminium Phosphide is an example of:
Pusa Himani is a variety of:
Which pest's larvae, affecting Sorghum crops, cut the growing points and lead to dead-hearts in the plant?
Why is a float valve important in the water tank of a drip irrigation system?
What is the chemically correct air-fuel mixture ratio for an Otto cycle engine?
How much premium will be provided for each 0.1% increase in recovery rate over and above 10.25%?
Which soil structure type is most conducive to root penetration and water infiltration?
Pinching in floriculture refers to:
The process of loss of water from plant is
Landraces are very good sources of genes for: