Question
10 women can complete a work in 7 days and 10 children
take 14 days to complete the work. How many days will 5 women and 10 children take to complete the work?Solution
ATQ, we can say that 10 women can complete the work in 7 days. 70 women can complete the work in 1 day. Again, 10 children can complete the work in 14 days. 140 children can complete the work in 1 day. 70 women = 140 children 1 women = 2 children 5 women + 10 children (10 + 10) children = 20 children. Now, 140 children can complete the work in 1 day 20 children can complete in 140/20 = 7 days Alternate Solution: (10W) × 7 = (10 C ) ×14  So 1W=2C Now , (10W) × 7 = (5W+10 C ) × T (10 × 2) × 7 = (5 × 2+10 × 1 ) × T 140 = 20T T = 140/20 = 7 days
Solve for x in the equation: 3(x + 2) + 2(2x - 5) = 5x + 9

If x = 19, then the value of x5 - 20x4 + 20x3 - 20x2 + 20x - 1 is
Given a triangle with two sides measuring 12 cm and 16 cm, which of the following cannot be a possible length for the third side?
The mean age of 30 students was calculated as 15 years. However, it was later discovered that one student's age was mistakenly entered as 15 years inste...
In a triangle ABC, a point D lies on AB and points E and F lie on BC such that DF is parallel to AC and DE is parallel to AF. If BE = 4 cm. EF = 6cm. th...
If a = 32, b = c = 31, then find the value of a 3  + b 3  + c 3  – 3abc.
If x3 + y3 = 9 and x + y=3 then the value of x4 + y4 is:
105, 111, 123, 141, ?, 195
Let {x + (1/x)} = 4, then Determine the value of {x² + (1/x²)}