Question
Anuj, Bittu, and Chintu can individually complete a
certain task in 84 days, 105 days, and 60 days, respectively. They all begin working together, but Bittu leaves after working for 12 days. Determine the total number of days required to complete the entire task.Solution
ATQ, Let total work = 420 days (LCM of 84, 105 and 60) Amount of work completed by Anuj in one day = 420/84 = 5 units Amount of work completed by Bittu in one day = 420/105 = 4 units Amount of work completed by Chintu in one day = 420/60 = 7 units Amount of work completed by Anuj, Bittu and Chintu together in 12 days = 12 × (5 + 4 + 7) = 192 units Amount of time taken by Anuj and Chintu together to complete the remaining work = (420 – 192)/12 = 19 days Desired time = 12 + 19 = 31 days
- A right-angled triangle has its smallest median measuring 4.8 cm. Find the hypotenuse.
The complete expense of covering the floor of a chamber at the rate of Rs 7.50 per square centimeter amounts to Rs 1875. If the length of the room measu...
A cuboid has length 6 cm, breadth 5 cm and height 4 cm. What is its volume?
What least number must be subtracted from 5224 to get a number exactly divisible by 43?
Determine the slant height of a cone with a height of 20 cm. The cone's base radius is the same as that of a sphere, which has a volume of 38,808 cm³. ...
If the curved surface area and the radius of a cylinder are 660 cm2 and 6 cm, respectively, then find the volume (in cm3) of the c...
The volume of a cube is 4096 cm³. If the cost of painting the cube is Rs. 4 per cm², then find the cost of painting five faces of the cube.
If (x² + 1/x2) = 4, which of the options below is a possible value of x² - 1/x2 ?
A man spends 70% of his income. If his income is increased by 25% and expenditure is increase by 20%. Find the % change in saving?
The length of the side of a cube is 7 cm. What is the total surface area of the cube?