Question
Aman, Bhanu, and Chinu can
complete a piece of work individually in 20 days, 30 days, and 60 days, respectively. How many days will Aman take to finish the work if Bhanu and Chinu assist him every third day?Solution
ATQ,
Work Rates: Aman completes 1/20 of the work per day. Bhanu completes 1/30 of the work per day. Chinu completes 1/60 of the work per day.
Work Schedule:
Total Time: In 3 days, 1/5 of the work is completed. Total work = 1 unit. Cycles needed = 1/(1/5) = 5. Total time = 5×3 = 15 days.
A cone is cut parallel to its base in 3 parts in such a way that the height of each part is same. Find the ratio of volume of these parts?
A circle inscribed in a square has a diameter of 14 cm. If a smaller square is inscribed within this circle, calculate the area of the smaller square. A...
The cost of fencing a rectangular field at the rate of Rs. 5 per meter is Rs.350. If the length of the field is 15 meters more than its breadth, then fi...
A prism and a pyramid have the same base and the same height. Find the ratio of the volumes of the prism and the pyramid.
The volume of cone is 1900.8 cm3. If its height is 1.4 cm then find the radius of the cone.
Two cylindrical buckets 'A' and 'B' are such that the radius of bucket 'A' is thrice that of bucket 'B' whereas the height of bucket 'A' is twice that o...
A cube of volume 768 cm³ is molded into a cuboid whose length, width, and height are in the ratio 3: 2: 2. Find the length of the cuboid.
Find the surface area of the smallest cube that can perfectly fit a sphere of volume 972π cm3 inside it.
Perimeter of a rectangle is 70% more than that of a square of side 22 cm. If the difference between the length and breadth of the rectangle is 15 cm, re...
Water flows at the rate of 10 meter per minute from a cylindrical pipe 5mm in diameter. How long it takes to fill up a conical vessel whose diameter at ...