Question
Aman, Bhanu, and Chinu can complete a piece of work individually in 20 days, 30 days, and 60 days, respectively. How many days will Aman take to finish the work if Bhanu and Chinu assist him every third day?
More Quant Miscellaneous Questions
- A factory produces two types of toys, A and B. The production cost of toy A is ₹15 and for toy B is ₹25. If the total selling price of 500 toys is ₹11,400 ...
- The average of a, b and c is 8 less than d. If the average of a, b, c and d is 42, and the average of b and c is 43. then find the average of (a-6) and (d+...
- A cone has a base radius of 7 cm and a slant height of 25 cm. Find the total surface area of the cone.
- 10, 9, 16, 45, 176, ?.
- What will come in place of '?' in the given expression? {(14.25 + 124 ÷ 16 + 23) ÷ 243 (1/5) + √169} ÷ √0.16 = ?
- "Arjun" can complete a task on his own in 20 days. "Bhuvan" requires 5 days more than "Chirag" to finish the same task, where "Chirag" is 20% less efficien...
- If log₃(2x + 3) = 2 + log₃(x – 1), find x.
- A rectangle has a length that is 4 cm more than its width. If the perimeter of the rectangle is 32 cm, find the dimensions of the rectangle.
- A container has 360 litres of a mixture containing milk and water in the ratio of 3:2. 50 litres of milk and ‘p’ litres of water are added into the contain...
- In the question, two equations I and II are given. You have to solve both the equations to establish the correct relation between x and y and choose the co...
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt
Think You're Ready for RBI Grade B?
RBI Grade B 2026 Phase 1 Memory Based Paper
- 200 Questions with Detailed Solutions
- Section-wise Coverage (GA, English, Quant & Reasoning)