Question
P and Q can do a job in 90 days, Q and R can do it in 112.5 days, while P and R can do it in 150 days. X is five times as efficient as P, Y is two-thirds as efficient as Q, and Z is 2.5 times as efficient as R. Determine the number of days required to complete the same job if X, Y and Z work together.
More Previous year papers Questions
- If two trains 200 m and 150 m long are running on parallel rails at the rate of 50 km/h and 30 km/h, respectively, find the relative speed if they are runn...
- Cost price of a watch is Rs. 750. If the loss percentage is 40 percent, then what is the value of loss?
- If a : b = 3 : 4, b : c = 2 : 3, and c : d = 5 : 6, then a : b : c : d is:
- In △XYZ, if XY = 5 cm, XZ = 7 cm and Q is a point on YZ such that XQ bisects ∠X, then YQ : QZ is:
- Let ABC and PQR be two congruent triangles, such that ∠A = P = 90°. If BC = 29 cm, PR = 21 cm, find the value (in cm) of AB.
- If 30% of (A + B) = 40% of (A – B), then find A ∶ B.
- The value of
- What is the currency of Mongolia?
- Find the sum of digit of smallest number which when divided by 2, 3, 4, 5 & 6 leave remainder 1 in each case.
- Find the total surface area (in m²) of a cone, if its slant height is 32 m and the diameter of its base is 48 m. [Use π = 22/7]
Relevant for Exams:
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt