Question
MI alone can do a work in 14 days and M2 alone can do the same work in 70 days. With help of M3, they finish the same work in 7 days. In how many days M3 alone can do the same work?
More Previous year papers Questions
- Find the curved surface area and total surface area, respectively, of a cylinder of radius of base 28 m and height 40 m.
- A circular swimming pool is surrounded by a circular path which is 4 m wide. If the area of the path is 44% of the area of the swimming pool, then the radi...
- A sum of money doubles itself in 4 years at simple interest. In how much time will it become 7 times at the same rate of interest?
- Ravi and Rajiv decided to run a 960 m long race on a track as long as the length of the race. Which of the statement(s) below is (are) sufficient to concl...
- Calculate the mode from the following data.
- The radii of two cylinders are in the ratio 3 : 4 and their heights are in the ratio 8 : 5. The ratio of their volumes is equal to:
- If two successive discounts of 25% and 15%, respectively, are given, then what will be the net discount iscount percent:
- The angle of elevation of the top of an unfinished pillar at a point 150 metres from its base is 30°. The height (in metres) that the pillar must be raised...
- If the HCF and LCM of two numbers are 8 and 160 respectively, then the sum of the numbers is:
- A sum of Rs. 7000 is invested in a scheme of simple interest. The rate of interest in this scheme is 20 percent per annum. If Rs. 1750 interest is obtained...
Relevant for Exams:
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt